GENERAL PROCEDURES (SUSPENSION)


BHE021001013W01

Wheel And Tire Installation

1. When installing the wheels and tires, tighten the wheel nuts in a criss-cross pattern to the following tightening torque.

Tightening torque
88-118 N·m {9.0-12.0 kgf·m, 65.0-87.0 ft·lbf}

Suspension Links Removal/Installation

1. For the joint sections with rubber bushings, raise the vehicle using a lift, and then temporarily tighten the installation bolts and nuts. Lower the vehicle to the ground and tighten them completely with the specified torque.

Connector Disconnection

1. Disconnect the negative battery cable before performing any work that requires handling of connectors.